Navigate the Gateway system with experts close to the local authorities
Among the myriad changes brought in by the Building Safety Act, the Gateway process for high-rise designs is among the leading game-changers.
Requiring the submission of designs to the Building Safety Regulator (BSR) at key intervals, the Gateway system opens the possibility of designs being rejected by a warranty provider after going through the Building Safety Regulator and an appointed Local Authority Building Control team.
Preventing a time-consuming redesign so late in the approval process is imperative to prevent designs from having to return to pre-BSR approval stages.
The LABC Warranty Early Engagement Consultancy Service is ideally placed to guide builders through the Gateway process, ensuring the greatest possible chance of producing designs that will satisfy all three stakeholders in this process while delivering quality new homes.