Soakaways cannot be used on all sites, for example, they may not be compatible in certain soil conditions such as chalk or clay. In addition, other factors such as the position of the ground water table, if the site is in a Groundwater Source Protection Zone or contamination can also influence if a soakaway is viable on your site. We therefore always require a minimum Phase Two Site Investigation Report clearly stating the ground is suitable for a soakaway. Some site investigations may not explicitly detail this, in such situations written confirmation from the geotechnical engineer will be required.
A percolation test will determine the size and depth the soakaway needs to be, however, before one is carried out, it’s important to remember a percolation test should not be carried out during or just after abnormal weather conditions such as heavy rainfall or a drought as this may skew your results.
BRE Digest 365 should be referred to for guidance on how to carry out a percolation test along with details on how to interpret the data to determine the size and depth of the soakaway.
A copy of the percolation test results should be provided from a suitably qualified professional.
A soakaway design in accordance with BRE Digest 365 should be provided. This must be from a suitably qualified professional and it may encompass the percolation test results.
Proposed drainage layouts clearly showing the distance the soakaways are to be from any building must also be provided. In addition, invert levels, gradients and pipe diameters should be detailed on the proposed drainage layouts.
Soakaways should be positioned so that they are:
For sites where chalk is prevalent, the CIRIA C574 Engineering in Chalk 2002 publication gives the following recommendations:
This article has provided some guidance on the key documentation we require where soakaways are specified, details on soakaway positioning and specifying soakaways in chalk ground conditions. For further detailed guidance on soakaways, please see Section 5 of the LABC Warranty Technical Manual.
Please note: The above guidance is only in relation to how you can satisfy our warranty requirements. This may be different to you satisfy the requirements of your Building Control Body.