Appendix C.1 – Materials, Products, and Building Systems
The designer shall ensure the suitability of the ground conditions for the purpose of supporting the development, by carrying out necessary site investigations including chemical analysis of soils to ensure that there are no harmful contaminants or hazards, which could cause deterioration of any element of the development.
Further information can be found within the ‘Ground Conditions’ section of our Technical Manual.
Where backfill is specified it should be certified by a competent laboratory that they are of a suitable nature and quality in relation to the purpose and conditions of their use. They should be chemically analysed to check if such materials contain any chemicals, which should also include the petrographic indicator of swelling potential.
The Petrographic Swelling Potential Indicator (PSPI) varies from 0 to 100 but is not a percentage. It is intended to be a visual evaluation of the sulphatic swelling potential of the materials used.
The following figures present the petrographic swelling potential that may generally be associated with the different PSPI values:
Any materials with a PSPI in excess of 20 will not be acceptable for warranty purposes.
Building Regulations:
Technical Manual:
BRE Digest DG 522: