We’ve summarised a few of the most crucial updates for the next edition of the LABC Warranty Technical Manual, and you can also find a link to the full change log here.
Having been moved to the start of the Technical Manual back Version 11, there are two new changes to Section 1, Ground Conditions.
Guidance itself has been updated to make it easier for readers to understand. This includes a new and easier-to-use flow chart, and new guidance for a basic ground investigation which is required where the phase one site investigation doesn’t flag any hazards.
In addition, the Functional Requirements now ask for site investigations to be dated within five years of construction starting on site.
Functional Requirements on Section 2, Basements, have been updated, requiring an engineer to design integral waterproofing structures such as foundations, walls and floors. They must be designed to support vertical loading, resist horizontal loading and resist surcharges including the influence of trees and nearby topography.
Two subsections of Section 3, Foundations, have been combined. These sections are Mass Fill (sub-section 3.1) and Strip (subsection 3.2). They are now combined into a section called Mass Fill and Strip.
Other changes include:
New advice in Section 4, Ground Floors, outlines guidance on stepped party walls.
Section 6, External Walls, has been updated to include:
Updated requirements are included for:
A new ‘provision of information’ is added to cladding types in sub-section 6.5.
Clearer guidance on lateral restraint is also included.
Section 8, External Windows and Doors, has been updated to offer new requirements for water tightness for glazing systems in developments over six storeys.
In addition, the section of stacked windows has been renamed to ‘Vertically Stacked Coupled Window Assemblies’ to better reflect the type of window being described in the guidance. This section also includes additional guidance on the aforementioned windows.
Section 9, Stairs, includes new guidance on glazed guarding.
Section 11, Roofs, now states in the functional requirements that, “Means of escape, passive and active systems are not covered by the Warranty”.
The ‘provision of information’ for pre-formed trusses and traditional-cut roofs now includes:
Section 19, Garages, has been updated to add guidance for services within a garage.
New guidance in also available for garage floors – we now recommend garage flows should laid to a fall and have a step where they’re integral to the house.
Appendix C provides new guidance around:
Download the full change log complete with all details of every change here.
Or, if you prefer, you can access Version 12 of the Technical Manual in full here.
If you’re a current LABC Warranty customer, and accepted your quote before 1 April 2024, then your site(s) will be held to the standards laid out in Version 11. You can access copies of Version 11 here.
However, if you’re in the process of starting a site with LABC Warranty, and it’s likely that you accept a quote and instruct LABC Warranty on or after 1 April 2024, then your site will be assessed against Version 12 by your assigned Risk Management Surveyor.